What roads are closed in Cambridgeshire for November?

Manor Park - Histon

The road is closed both ways to all motor vehicles today (November 1) until November 3 due to works by Cambridge Water.

Chaston Road - Great Shelford (between Hinton Way and Grain Close)

The road is closed both ways to all motor vehicles today (November 1) until November 17 due to works by Cadent Gas.

B1102 Station Road - Fordham at the level crossing

Closed both ways to all traffic until November 3 due to work by UK Power Networks.

Stagecoach East 

#Cambridge Bonfire Night Saturday November 4th 2023.18:00 - 21:30Whilst the fireworks are happening we will be unable to serve the bus stops in the area .Please follow the link below for more information https://t.co/D3qyXyuc3p pic.twitter.com/4RFHVNU2uo[1][2][3]

— Stagecoach East (@Stagecoach_East) October 31, 2023[4]

Hale Avenue and Stretten Avenue - Cambridge

The road will be closed both ways to all motor vehicles on November 2 between 9:30am and 3:30pm due to works by Openreach.

B1542 High Road - Wisbech St Mary

The road is closed both ways to all motor vehicles until November 3 due to works by Anglian Water.

A1134 Newmarket Road - Cambridge

A lane closure is in place northbound between River Lane and Cheddars Lane until November 3 due to emergency works by UK Power Networks.

Wisbech Road - Manea

The road will be closed both ways to all traffic from 10:30pm on November 4 until 8:30am on November 5 due to works by Network Rail.

Park Lane - Castle Camps

The road will be closed both ways to all motor vehicles between November 2-6 due to works by UK Power Networks.

High Street - Swaffham Prior

The road will be closed both ways to all motor vehicles between November 5-6 between 7pm and 7am due to works by Anglian Water.

Station Lane - Offord Cluny

The road will be closed both ways to all traffic from 11pm on November 5 until 6am on November 6 due to works by Network Rail.

Station Road/Newton Road – Harston (at the level crossing)  

Closed until November 7 between 8am and 5pm daily due to works by Network Rail.

B1096 Doddington Road - Benwick

The road will be closed both ways to all motor vehicles between November 6-7 between 9:30am and 3:30pm daily for works.

Earl Street and Orchard Street - Cambridge

The road is closed both ways to all motor vehicles until November 11 between 9:30am and 3:30pm daily due to works by City Fibre.

Upton Hill - Upton

The road will be closed both ways to all motor vehicles until November 13.

Eagles Lane - Little Downham 

Closed both ways to all traffic until December 1 for works.

A10 Milton Bypass - Milton (between Milton roundabout & Butt Lane)

The road is closed both ways to all motor vehicles overnight until December 9 between 9pm and 5am nightly for carriageway works. (No works on November 17)

References

  1. ^ #Cambridge (twitter.com)
  2. ^ https://t.co/D3qyXyuc3p (t.co)
  3. ^ pic.twitter.com/4RFHVNU2uo (t.co)
  4. ^ October 31, 2023 (twitter.com)