h2s

Balfour Beatty Vinci slides HS2 bridge

The operation, which took place between December 24-26, involved approximately 450 of BBV’s people and took 40 hours to complete, HS2 said.
The 86 m-long structure, developed by design joint venture Mott MacDonald and Systra on behalf of BBV, was b…

Mind the gap – HS2 bridges major highway

The HS2 high speed rail project in Britain is claiming a world first for their ‘bridge slide’ operation, carried out over Christmas, and over the M42 motorway in Warwickshire, in the English Midlands. Engineers claim the move of the 12,600 tonne bridge…