Temporary closure of Laira Rail Bridge | PLYMOUTH.GOV.UK
The Laira Rail Bridge is temporarily closed for essential maintenance.
The off-road walking and cycling link, which connects The Ride and the Laira Cycleway, requires repairs to its deck plates and non-slip surface.
Walkers and cyclists are being diverted via the Laira Road Bridge footway during the works, which are expected to take up to three weeks.
We’d like to thank everyone for their patience during the repairs.