Plymouth roadworks this week taking place across the city
There are a raft of new roadworks starting this week in Plymouth. The schemes will impact on several roads in the city and are ones motorists need to be aware of before setting out on their journeys.
On Milehouse Road, for the next ten days, there will be four-way traffic at the Ford Hill/Molesworth Road junction. This is so CityFibre can carry out fibre cable works, with the traffic lights in operation 24 hours a day.
On Monday and Tuesday, on Tavistock Road, there will be one lane closed in each direction between William Prance Road and Sendalls Way. The closures are between 9.30am and 3pm and for signage works to be carried out.
On Wednesday, on the inbound approach to the Derriford Roundabout, one lane will be closed on approach to Brest Road between 9.30am and 2pm. And on Thursday night on Union Street, from 6.30pm to 10.30pm, outside Lidl, there will traffic lights in place while South West Highways carry out a bollard replacement.
Plymouth City Council has helpfully put out a list of roadworks that will be taking place across the city over the next week. The council is responsible for coordinating works carried out by utility companies, developers and other organisations as well as their own repair, maintenance and improvement works.
They maintain all public roads in Plymouth except the A38, which is managed by National Highways on behalf of the Department for Transport.
“We know there's no good time to close roads, especially on busy routes and we do everything we can to co-ordinate planned works and minimise their impact on our transport network,” a City Council spokesman said.
The following roadworks are taking place in Plymouth between Monday 17 and Saturday 22 July.
STARTING THIS WEEK
Acre Cottages
Monday 17 July to Friday 4 August
Road closed, 24 hours a day
Fibre cable works
CityFibre
Beauchamp Road
Monday 17 to Friday 21 July
Road closed at side of number 1, 24 hours a day
New connection
South West Water
Beresford Street
Monday 17 to Wednesday 26 July
Road closed between Ford Hill and number 1, 24 hours a day
Fibre cable works
CityFibre
Eggbuckland Road
Monday 17 to Friday 28 July
Rolling two and three-way signals from number 207 to Donnington Drive junction, 24 hours a day (manually controlled at peak times)
Fibre cable works
CityFibre
Laira Bridge Road (inbound)
Monday 17 to Friday 21 July
Bus lane closed outside Russell Ham car sales, 9.30am to 3.30pm
Bus shelter works
Clear Channel
Leatfield Drive
Monday 17 to Saturday 22 July
Two-way signals outside number 19, 9.30am to 3.30pm
Telecoms work
Hutchison 3G Ltd
Mannamead Road (outbound)
Monday 17 to Friday 21 July
Bus lane closed at Vapron Road junction, 9.30am to 3.30pm
Bus shelter works
Clear Channel
Milehouse Road
Monday 17 to Wednesday 26 July
Four-way signals at Ford Hill/Molesworth Road junction, 24 hours a day (manually controlled at peak times)
Fibre cable works
CityFibre
Tavistock Road
Monday 17 and Tuesday 18 July
One lane closed in each direction between William Prance Road and Sendalls Way, 9.30am to 3pm
Signage works
South West Highways
Hooe Road
Tuesday 18 to Wednesday 19 July (one night)
Multi-way signals at Barton Road junction, 7pm to 5am
Blockage clearance
BT
Novorossiysk Road (inbound)
Tuesday 18 July
One lane closed on approach to Miller Way, 6.30pm to 10.30pm
Street lighting works
South West Highways
Weston Park Road
Tuesday 18 to Thursday 20 July (two nights)
Rolling two-way signals, 7pm to 5am
Lining works
South West Highways
Derriford Roundabout (inbound)
Wednesday 19 July
One lane closed on approach to Brest Road (access maintained), 9.30am to 2pm
Signage works
South West Highways
Healy Place
Wednesday 19 to Thursday 27 July
Road closed between Benbow Street and Victoria Place, 24 hours a day
Fibre cable works
CityFibre
Vauxhall Street
Wednesday 19 to Thursday 20 July (one night)
Three-way signals at Bretonside junction, 7pm to 3am
Overhead cable works
BT
Culver Way
Thursday 20 July
Two-way signals near Leigh Court, 8.30am to 5pm
Bus shelter removal
JC Decaux
Ryder Road
Thursday 20 to Thursday 27 July
Two-way signals from Masterman Road to Jackson Place, 24 hours a day
Fibre cable works
CityFibre
Union Street
Thursday 20 July
Two-way signals outside Lidl, 6.30pm to 10.30pm
Bollard replacement
South West Highways
Wolseley Road (inbound)
Thursday 20 and Friday 21 July
One lane closed near Terra Nova Green, 9.30am to 3pm
Variable messaging sign replacement
SWARCO
Outland Road (outbound)
Thursday 20 and Friday 21 July
One lane closed on approach to Segrave Road, 6.30pm to 10.30pm
Traffic signal works
SWARCO
Miller Way
Friday 21 July
Two-way signals near St Marks Road junction, 9.30am to 3.30pm
Bus shelter removal
JC Decaux
CURRENT/ONGOING WORKS
Alpha Way
Until Friday 18 August
Road closed at rear of The Range car park, 8am to 5pm (when required)
Works for new development
MTX Construction
Blunts Lane
Until Saturday 30 September
Road closed, 24 hours a day
Forder Valley Link Road
Balfour Beatty
Central Park Avenue
Until Friday 28 July
Two-way signals outside number 28, 24 hours a day (manually controlled at peak times)
Jointing works
National Grid
Colin Campbell Court
Until Monday 31 July
Road closed outside number 32 (access to car park maintained), 24 hours a day
Demolition works
Plymouth City Council
Eggbuckland Road
Until Friday 21 July
Rolling multi-way signals from number 20 to number 203, 24 hours a day (manually controlled at peak times)
Fibre cable works
CityFibre
Julian Street
Until Monday 31 July
Road closed from Cattedown Road to Oakfield Road, 24 hours a day
Gas main works
Wales and West Utilities
Montpelier Road
Until Friday 18 August
Three-way signals at Beacon Park Road junction, 24 hours a day (manually controlled at peak times)
New crossing
South West Highways
New George Street
Until Tuesday 3 October
Road closed between Old Town Street and Tesco Metro, 24 hours a day
City Centre Improvement Scheme[1]
Morgan Sindall
North Hill
Until Sunday 10 September
Multi-way signals at North Road East junction, 24 hours a day (manually controlled at peak times) and no left-hand turn into Clifton Place
South West Highways
North Hill (outbound)
Until Friday 21 July
No left turn at North Road East junction, 24 hours a day
Water main works
South West Water
North Road East (eastbound)
Until Sunday 10 September
Road closed from Evelyn Place to North Hill, 24 hours a day
Junction upgrade
South West Highways
Oakfield Terrace Road
Until Monday 14 August
Road closed between Julian Street and Tresillian Street, 24 hours a day
Gas main works
Wales and West Utilities
Old Town Street
Until Tuesday 3 October
Road closed, 24 hours a day
City Centre Improvement Scheme
Morgan Sindall
Pike Road
Until Thursday 3 August
Rolling multi-way signals from Blandford Road to number 82, 24 hours a day (manually controlled at peak times)
Fibre cable works
CityFibre
Poole Park Road
Until Monday 14 August
Two-way signals near Wilkinson Road junction, 24 hours a day
Water main works
South West Water
Saltash Road, Keyham (eastbound)
Until Wednesday 9 August
One lane closed outside dockyard emergency entrance (between Ocean Street and Wolseley Road), 24 hours a day
New substation works
National Grid
Savage Road
Until Monday 14 August
Three-way signals at Kelly Close junction, 24 hours a day
Water main works
South West Water
Savage Road
Until Saturday 31 December
Road closed between Kelly Close and Talbot Gardens, 24 hours a day
Regeneration works
Fred Champion Groundworks Ltd
St Lawrence Road
Until Friday 18 August
Road closed (residents’ and school access maintained), 24 hours a day
Cable works
National Grid
Stuart Road
Until Friday 21 July
Two-way signals between numbers 45 and 56, 24 hours a day (manually controlled 7am to 7pm)
Link box replacement
National Grid
Tamerton Foliot Road
Until Saturday 15 July
Two-way signals at Silver Hill development junction, 24 hours a day (manually controlled at peak times)
Carriageway construction
WBM Groundworks
Tresillian Street
Until Monday 7 August
Road closed from number 22 to Oakfield Terrace Road, 24 hours a day
Gas main works
Wales and West Utilities
Whitsoncross Lane
Until Friday 28 July
Rolling multi-way signals from Ashleigh Close to Rock Hill, 24 hours a day
Gas main works
Wales and West Utilities
View all current and proposed works on the network on our roadworks map[3].